You ask in plain words
With whatever notes or documents you already have.
Which builder’s quote is really cheaper once VAT and extras are counted?
Which quote gives me the lower complete price?
Your notes
Scope: repointing, scaffolding. Ash: repointing and scaffolding £18,600 including VAT, fixed. Elm: repointing £16,400 plus 20% VAT, fixed. Scaffolding excluded.
Your agent answers with a checked method
It runs 5 checks before it replies.
Your agentUsing this skill
Ash quotes £18,600 including VAT and scaffolding. Elm is already £19,680 including VAT for the repointing alone. Ask Elm for its fixed total including scaffolding and VAT before comparing complete bids.
- An excluded scaffold, skip or waste disposal line can reverse the apparent price order.
- A lower provisional or prime cost allowance is not a saving. It moves the risk to the customer unless both builders price the same specification.
- A much lower price can mean the builder is not quoting for the same work. Check scope before praising a saving.
- Estimates and daily rates can rise. Never rank an estimate against a fixed quote as if both were final.
- VAT on building work depends on the job and the builder. New dwellings, some conversions and energy-saving installations can carry reduced or zero rates, so read the quote rather than applying 20% by default.
Why that’s right. Elm's known total already exceeds Ash's. Its complete price remains unknown.
Is it the right skill?
What it’s for, and when another skill or a person is the better choice.
Use it when
- Someone has two or more written quotes or estimates for the same building, roofing, landscaping or repair job.
- The totals look different but the quotes use different wording for VAT, allowances, exclusions or extras.
- Someone wants a list of questions to send each builder before signing.
Not the right skill when
- Judging whether a builder is competent, insured or trustworthy. Point the person to references, insurance documents and trade body checks instead.
- Checking a finished invoice against its quote. Use the Check an invoice against a quote skill for that.
- Giving a legal view on a dispute or a binding VAT ruling. The method only reads what the quotes say.
The method it follows
7 steps, in order, every time.
- Write the required scope as a list of work items, using the person's description or drawings. Each quote is checked against that list, not against the other quotes.
- Make a row for each work item and a column for each builder. For every cell record included, excluded, provisional sum, prime cost sum or not mentioned, with the page or line it came from. Silence is not inclusion.
- Record each document's price status: fixed quote, estimate or daily rate. Note how long the price is valid and any stated reasons it can change.
- Put every price on the same tax basis. Use only an explicit VAT rate or a stated inclusive total. If a quote does not say whether VAT applies, keep its inclusive total unknown and ask. Do not assume every builder is VAT-registered, or that one rate covers all work.
- Add written, priced clarifications once, to the quote they change. Do not add a provisional sum again if the contract price already includes it.
- Compare totals only when every builder covers the same items, on the same tax basis, with comparable allowances and price status. Otherwise report the known totals and exactly what stops a fair comparison.
- For every gap, draft one specific question to that builder asking for a written, fixed price or specification.
What to have ready
If something’s missing, your agent asks before it starts.
- The work you need, any drawings or schedule, and each dated quotation including exclusions, allowances and VAT wording.
- Any later written clarifications. Identify which quotation each one changes.

What work do you need done? A list or drawing of the full scope lets every quote be checked against the same items.

Do you have every page of each quote, including terms, exclusions and any later emails that changed the price?

Is each document a fixed quote or an estimate, and how long is each price valid?
Try it on your own AI
A new question with a known answer, so you can check your AI gets it right.
-
Copy the questionCompare both final prices, including the amended line. Return only JSON following the skill’s test format. Scope: paving, disposal. Brook: paving £3,300 including VAT, fixed. Disposal excluded. Signed addendum: fixed disposal £150 including VAT. Dale: paving and disposal £2,900 plus 20% VAT, fixed.
-
Ask your AI in a new chat
Give it this skill first, then paste the question. It replies with a short block of data in the format the skill asks for.
-
Show the answer and why
Adding the signed disposal line once resolves the scope gap and makes a £30 comparison possible.
{
"quoted_gbp": {
"Brook": 3450,
"Dale": 3480
},
"gaps": {
"Brook": [],
"Dale": []
},
"lower_comparable_bidder": "Brook"
}
The check runs in your browser. Nothing you paste is sent anywhere.
Where the method comes from
Free to use and adapt with credit (CC BY 4.0).
Use this skill in Raq.com
Add it to your Skill Library and your agent applies it whenever a request matches. Edit it for your own business and keep every version.