You ask in plain words
With whatever notes or documents you already have.
How many gift sets can we make from the stock on the shelf?
How many gift kits are available now?
Your notes
Per kit: BOX 1, LINER 1 in base plus LINER 1 in lid, MUG 2. Physical BOX 12 reserved 2; LINER 30 reserved 9; MUG 22 reserved 3.
Your agent answers with a checked method
It runs 5 checks before it replies.
Your agentUsing this skill
Nine gift kits can be made now. Mugs limit the run to nine pairs. After assembly the free stock is one box, three liners and one mug. The reserved units remain committed.
- Adding capacities across components returns imaginary kits.
- Two uses of the same bag or fastener in one bill consume twice the stock.
- Deducting reservations from a figure that is already net of them understates what can be built.
- Counting an unapproved look-alike part as a substitute turns a stock gap into a quality problem.
- Promising kits from goods that have not arrived. Future receipts are not current stock.
Why that’s right. Nineteen free mugs make nine complete pairs. Both liners must be counted.
Is it the right skill?
What it’s for, and when another skill or a person is the better choice.
Use it when
- Someone asks how many gift sets, bundles or kits can be made from what is on the shelf.
- Sales wants to promise a quantity and needs to know which component runs out first.
- Several kits share components and one order has priority.
Not the right skill when
- Deciding how much of each component to reorder. Use the stock reorder skill.
- Explaining differences between a stock count and the books. Use the stocktake cut-off skill.
- Scheduling assembly labour or machine time. The method checks components only.
The method it follows
6 steps, in order, every time.
- Choose the correct bill of materials and version. Convert required quantities and stock to the same unit before dividing, and combine repeated uses of the same component in one kit.
- Work out free stock: physical stock less committed units, deducted once, floored at zero. Leave out supplier stock, future receipts and stock held elsewhere unless the request sets a future date or another location.
- For each required component, divide free stock by units per kit and round down. The smallest result limits complete kits. List every component tied at that minimum as a bottleneck, and calculate what remains of each component after building that many kits.
- If a required component has no stock record, keep the result unknown. Use a substitute only if it is explicitly approved.
- For several kits sharing stock, build in the stated priority or committed order and reduce each component balance after each kit type. With no priority or mix, present the separate maxima as alternatives and ask which mix is wanted before promising a combined quantity.
- Before a firm promise, check that the bottleneck stock figure is reliable, for example with a quick count, and state how many more bottleneck units each extra kit would need.
What to have ready
If something’s missing, your agent asks before it starts.
- Component quantities required per kit, from the current bill of materials
- On-hand units, reservations and any alternate components explicitly approved

Which bill of materials and version applies, with the quantity of each component per kit and its unit?

Is the stock figure physical on hand, or already net of reserved orders?

Are there firm orders or reservations, and which kit has priority if several share parts?

Are any substitute components formally approved?
Try it on your own AI
A new question with a known answer, so you can check your AI gets it right.
-
Copy the questionCan the team promise these kits? Return only JSON following the skill’s test format. Per kit: BRACKET 1, WASHER 2. Physical BRACKET 20, none reserved. The stock extract contains no WASHER row. Similar spare rings are unapproved.
-
Ask your AI in a new chat
Give it this skill first, then paste the question. It replies with a short block of data in the format the skill asks for.
-
Show the answer and why
The missing record prevents a defensible promise.
{
"buildable": null,
"bottlenecks": [],
"leftovers": {},
"missing": [
"WASHER"
]
}
The check runs in your browser. Nothing you paste is sent anywhere.
-
Copy the questionFill A first, then build as many B as possible. Return only JSON following the skill’s test format. Free stock BEARING 12, BOX 4, BAG 3. A requires two BEARING and one BOX. B requires three BEARING and one BAG. Firm order A 2, no other reservations.
-
Ask your AI in a new chat
Give it this skill first, then paste the question. It replies with a short block of data in the format the skill asks for.
-
Show the answer and why
Two A consume four bearings. Eight remain and support only two B.
{
"built_by_kit": {
"A": 2,
"B": 2
},
"leftovers": {
"BEARING": 2,
"BOX": 2,
"BAG": 1
}
}
The check runs in your browser. Nothing you paste is sent anywhere.
Where the method comes from
Free to use and adapt with credit (CC BY 4.0).
Use this skill in Raq.com
Add it to your Skill Library and your agent applies it whenever a request matches. Edit it for your own business and keep every version.