You ask in plain words
With whatever notes or documents you already have.
Is anything mandatory missing from our tender before we submit it?
Check our pack against the final tender instructions.
Your notes
ITT §2 M1 signed declaration; §3 M2 method max 400 words; §4 M3 attach insurance schedule; §5 M4 subcontractor form only if subcontracting. Optional brochure scores style. Addendum 2 replaces M2 limit with 500 words. Inventory: declaration unsigned; method 460 words; narrative says insurance will follow. No subcontractors.
Your agent answers with a checked method
It runs 5 checks before it replies.
Your agentUsing this skill
Two mandatory items prevent submission. Sign the M1 declaration and attach the M3 insurance schedule. M2 meets the revised 500-word limit at 460 words. M4 does not apply because the bid uses no subcontractors.
- A promise in the narrative to attach a certificate does not establish that it is in the submission.
- A dated amendment takes precedence for its own clause. Do not import requirements from a different competition or jurisdiction.
- Checking against the original ITT after an addendum. A replaced word limit, form version or deadline can make a compliant pack non-compliant, or the reverse.
- Treating an upload as a submission. On the government eSourcing system a response stays in draft until Submit Response is confirmed, and buyers cannot see an unsubmitted response.
- Marking a conditional requirement not applicable without the fact that makes it so, such as a recorded decision not to use subcontractors.
Why that’s right. The addendum saves the method response. A promised insurance schedule is still missing.
Is it the right skill?
What it’s for, and when another skill or a person is the better choice.
Use it when
- Someone is about to submit a tender, ITT, RFP or quotation response and wants to know whether anything mandatory is missing.
- The buyer has issued addenda or clarification answers that change word limits, forms, signatures, the deadline or the submission channel.
- A bid team wants to know whether a portal upload counts as a submitted tender.
Not the right skill when
- Scoring the quality of the answers or predicting the evaluation result. Use the weighted bid scores skill to recalculate a published scoring matrix.
- Deciding whether a public buyer will accept a late or non-compliant tender. Under the Procurement Act 2023 that is the buyer's discretion, so raise it through the tender's clarification channel before the deadline.
The method it follows
7 steps, in order, every time.
- Collect the governing documents for this opportunity and lot: tender notice, invitation to tender, schedules, every addendum and the clarification log, in issue order. Do not import requirements from a different competition, lot or jurisdiction.
- Build a register keyed by the buyer's requirement IDs, with the wording, locator and version behind each row. Apply an addendum only to the requirements it explicitly changes and keep the remaining original instructions.
- Separate mandatory deliverables, conditional requirements and scored preferences. Resolve each condition from supplied facts, such as a confirmed decision not to subcontract. If applicability is uncertain, hold it for clarification. Leave scored preferences out of the compliance check.
- Inspect each submitted artefact: signature state, named template, completeness, currency and any word or page limit in the final instructions. A filename can establish presence but cannot prove a signature or a substantive answer.
- Classify every mandatory requirement. Missing means no artefact, including one the narrative promises to send later. Defective means present but visibly failing, such as unsigned or over the limit. Review means the evidence cannot be inspected or is inconclusive. Not applicable needs a supporting fact.
- Separate a pack that is ready from proof that the buyer received it. Use the latest official deadline, time zone and channel, and look for a portal submitted status or confirmation where the buyer requires one. An upload, a saved draft or an informal team email does not prove receipt. Under the Procurement Act 2023 a buyer may disregard a tender that breaches a procedural requirement in its tender documents, such as lateness or an exceeded word count.
- For every open item, state what would clear it and who must act, then re-run the check after each fix.
What to have ready
If something’s missing, your agent asks before it starts.
- Invitation to tender, schedules, amendments and clarification answers in issue order.
- Actual submission inventory, response text and current signed documents.

Can you share the full tender pack, including every addendum and the clarification log in issue order? A later addendum can change a limit, a form or the deadline.

What exactly is in the submission as it stands: the files, the signed copies and the response text? A file list alone cannot show a signature or an answer.

Has anything been submitted yet, and what does the portal show as its status or confirmation?

Who is the buyer and which rules govern the procurement? The Procurement Act 2023 governs most public buyers in England, Wales and Northern Ireland for procurements started on or after 24 February 2025. Devolved Scottish authorities, earlier procurements and other countries follow their own rules.
Try it on your own AI
A new question with a known answer, so you can check your AI gets it right.
-
Copy the questionCan I mark this tender complete? Return only JSON following the skill’s test format. M1 submit signed price schedule; M2 submit two references. Inventory: PriceSchedule.pdf listed, content unavailable; references.pdf inspected, two references present.
-
Ask your AI in a new chat
Give it this skill first, then paste the question. It replies with a short block of data in the format the skill asks for.
-
Show the answer and why
File presence cannot establish that the price schedule is signed.
{
"ready": false,
"met": [
"M2"
],
"missing": [],
"defective": [],
"review": [
"M1"
],
"not_applicable": []
}
The check runs in your browser. Nothing you paste is sent anywhere.
-
Copy the questionDid our tender reach the buyer? Return only JSON following the skill’s test format. M1 submit the form unsigned or signed. M2 submit using final instructions. ITT initially required signature, Tuesday noon email. Buyer Addendum 2 removes signature and requires receipt via portal by Thursday 10:00 London time. Final unsigned form reviewed and present. Team email says Friday. Portal screenshot shows the form uploaded but status and confirmation are unavailable.
-
Ask your AI in a new chat
Give it this skill first, then paste the question. It replies with a short block of data in the format the skill asks for.
-
Show the answer and why
Addendum 2 controls the signature, channel and deadline. File presence alone cannot establish final transmission.
{
"ready": false,
"met": [
"M1"
],
"missing": [],
"defective": [],
"review": [
"M2"
],
"not_applicable": []
}
The check runs in your browser. Nothing you paste is sent anywhere.
Where the method comes from
Free to use and adapt with credit (CC BY 4.0).
Use this skill in Raq.com
Add it to your Skill Library and your agent applies it whenever a request matches. Edit it for your own business and keep every version.